top of page

Bear Creek Village

  • Writer: Lunstrumelectric
    Lunstrumelectric
  • Jul 2, 2024
  • 1 min read

Lunstrum Electric completed installation of 7 meter switch gear with main breaker disconnect. We ran underground conduit from the existing PSE box to the new switch gear location. We set a 6' gutter above the existing meter locations and spliced 5 feeders and re-fed to the new switch gear.






 
 
 

Comments


  • w-facebook
  • Twitter Clean
  • White Google+ Icon
bottom of page