Bear Creek Village

Writer: Lunstrumelectric
Lunstrumelectric
Jul 2, 2024
1 min read

Lunstrum Electric completed installation of 7 meter switch gear with main breaker disconnect. We ran underground conduit from the existing PSE box to the new switch gear location. We set a 6' gutter above the existing meter locations and spliced 5 feeders and re-fed to the new switch gear.






 
 
 